Engineering and Energy
Poor execution of the construction of a Pyrolysis Plant
At martinsdelima, we had the opportunity to analyze a pioneering project for the construction of an industrial pyrolysis plant. Our role involved producing two reports, the first studying the economic situation of the plant and the second at a technical level. To this end, we had to make several visits to the plant.
We studied the engineering project, examining and delving into its particularities. In this case, our work was based on detecting all the technical deficiencies committed by the engineering firm in charge of developing the plant.
We also carried out an economic analysis to quantify the damages caused to our client. To this end, we calculated the actual loss and loss of profit.
The actual loss took into account all the expenses and investments made that were not included in the engineering project.
The loss of profit quantified the present value of the profits not obtained, as it was necessary to increase the personnel planned in the initial project to operate the plant correctly.
We also calculated the damage caused by the delay in the start-up of the plant.
Finally, the ratification in court was fundamental, presenting to the judge in a simple and dynamic way those technical aspects that gave rise to the controversy and answering the questions asked by the other party.